← Stockpile Volume Calculation

Weekly Stockpile Tracking for Construction Material Management

Material movement affects budget and schedule. When site conditions and the selected workflow are suitable, weekly aerial capture adds a dated visual record and planning-oriented volume estimates that can be reviewed alongside truck tickets, field records, and accounting data.

Why Material Tracking Matters for Budget and Schedule

Construction material management is one of the most overlooked sources of budget risk. Without tracking, you rely on:

  • Truck tickets — which tell you what was delivered, not where it ended up
  • Visual estimates — which can vary significantly between reviewers
  • Subcontractor self-reporting — which may not match reality
  • Spreadsheet reconciliation — which is always a week behind

The result can be delayed visibility into material trends and disagreements about quantities. Consistent aerial documentation can add a dated record of selected visible piles and areas, with the measurement method and limitations stated for the assignment.

How Weekly Aerial Tracking Works

Repeat Surface Models

When volumetrics are selected and conditions are suitable, repeat flights can produce Digital Surface Models of visible captured surfaces for comparison.

Surface Comparison

Sufficiently aligned and comparable DSMs can support estimated positive, negative, and net surface change within defined areas.

Selected Pile Estimates

Defined stockpiles can be reviewed individually when their geometry, visibility, capture conditions, and base surfaces support the requested estimate.

Material Trend Review

Use the estimates with truck tickets, field records, and qualified checks to review material trends rather than treating aerial data as a standalone accounting record.

What You Can Track

Imported material: new piles that appear between flights
Exported material: piles that shrink or disappear
Relocated material: piles that move from one area to another
Cut/fill progress: net earthwork balance across the site
Stockpile growth trends: which piles are growing vs. being consumed
Per-pile volume change week over week
Total site material inventory at any date
Date-stamped records for dispute resolution

Case Study

Chehalis: Material Movement at Scale

The Chehalis neighborhood development spans approximately one mile, with 20+ heavy machinery vehicles operating simultaneously. Material moves constantly — imported fill for road base, topsoil stripped and stockpiled, excess dirt hauled to another area of the site.

At this scale, ground-level review alone can make material trends difficult to see. Weekly aerial documentation gives the team a consistent visual reference and planning estimates for selected visible piles and areas.

The existing-conditions flight established a dated baseline. Consistent follow-up flights can support cumulative comparison over time, subject to alignment, visibility, base-surface, capture, and processing limitations.

Integrating Volume Data Into Your Workflow

Aerial volume data is most valuable when it feeds into your existing project management workflow:

  • Share documented per-pile estimates with the accounting team as one input to budget review
  • Compare aerial estimates with contract-required quantity records and qualified field checks
  • Review visible material placement alongside delivery records and site documentation
  • Use week-over-week trends to forecast material needs for the next phase

Frequently Asked Questions

Review Material Trends Week Over Week

Get a quote for weekly aerial documentation with volume tracking and cut/fill analysis.

Skyline Aerial Solutions · 360-960-9013 · Taj@skylineaerialsolution.com

FAA Part 107 Licensed & Insured · Serving Southwest Washington and the Puget Sound region